Work continues on the Chesapeake Western Depot in Harrisonburg, Virginia. The demolition and framing are done. The electricians have finally started rough-in. The plumbing fixtures are all ordered. Things are about to start moving quickly.

20151231_092229

Our sign is out front and gravel is down in the front lot. The windows have temporary plastic protection allowing work to continue inside while we wait on window installation. The wood paneling in the Herr & Co. office has been removed to be refinished.

20151208_130550 20151208_130732 20151208_130833

With each step along the way we are working on finalizing interior finishes to make sure we get things just right. Our goal is to preserve the original intent of the design while implementing the appropriate HVAC and lighting systems. On the lower level things are tricky, we are attempting to hide needed wiring while maintaining the exposed wood ceilings and lattice-work.

Chesapeake Western Depot Chesapeake Western Depot Chesapeake Western Depot Chesapeake Western Depot

Want to see more, check out these posts HERE, HEREHEREHERE and HERE.

5 Comments Add yours

  1. Kay Smith says:

    Sounds good and looks good too.

    Sent from my iPad

    >

    Liked by 1 person

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s